ABDUL WALI KHAN UNIVERSITY MARDAN
(Quality Education at Door step)
TENDER NOTICE FOR THE PURCHASE OF LAB EQUIPMENT & CHEMICALS
Sealed bids are invited from the interested firm/companies
registered with tax departments for approved Research
Project entitled "Assessing
the Cause of Groundwater Nitrate Pollution in Pakistan and the Development of
Environmental Chemistry Research and Curriculum at Abdul Wali Khan University
Mardan", No.6-4/PAK-US/HEC/2015/04,
required for supply Lab equipment and Chemicals. The tender
documents can be obtained from the Procurement office on the payment of
non-refundable amount of Rs. 2000/-(Rupees: Two thousands only for each tender
till 4.00 PM on working days. The bids
must reach the Procurement office on or before March, 08 2017 at 10:00 AM and
will be opened on the same day at 11:00 AM in the presence of the suppliers or
their authorized representatives, in the Conference room of the University
(AWKUM) at Garden Campus.
|
Items
|
Qty.
|
Period of Supply
|
01
|
Ion Chromatography system
|
01
|
90 days
|
02
|
Kjeldal Extraction system
|
01
|
90 days
|
03
|
pH/ISE/conductivity/DO Meter (millimeter) with all electrodes and accessories(Portable/
banchtop)
|
01/each
|
90 days
|
04
|
XRF Analyzer (Portable)
|
01
|
90 days
|
05
|
Voltammetry/Potentiostate
|
01
|
90 days
|
06
|
FTIR spectrophotometer
|
01
|
90 days
|
07
|
UV-Visib. Spectrophotometer
|
01
|
90 days
|
08
|
Arsenic EDL lamp with adopter
|
01
|
90 days
|
09
|
Graphite tubes (HGA) pyro coated
tubes
|
40/-
|
90 days
|
10
|
Flam Photometer
|
01/-
|
90 days
|
11
|
Certified Reference Materials
|
01/each
|
90 days
|
Term &
Conditions
1.
Earnest money is 2% of the tender cost.
2. No tender will be accepted with out production of 2% earnest money in the shap of call
deposit/pay order.
3. The quoted price
should be FOR&C&F.
4. The offer must
remain valid for 120 days from the date of opening for the successful
tender/bidders.
5. After approval of
tender, the successful contractors shall be bound to supply the request items
in the specific time, otherwise the related
material/equipment will be purchased after completion of the legal
proceeding at the risk and cost of the failure.
6. The contractor shall
be bound to abide the rules and regulation along with the specified terms and
conditions or directions of the related higher authorities as well as decision
of tenders opening committee.
Treasurer
Abdul
Wali Khan University Mardan
Tel. No. 0937-
843368 – 843360
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.